少女配狗播放视频,《为子献身》高清完整版在线观看 ,美国伦理巜干柴烈火2-美国伦理巜干柴烈火2,老师好爽要尿了潮喷了18P,《黏糊糊的你》免费观看

Welcome to Luotian MinTai Stone Col.,Ltd.
  • E-Mail:1013992589@qq.com Hot-Tel:18060329133/18120325888/18371383699
  • 简体中文
  • ENGLISH
  • Stone Knowledge

    Stone processing needs to pay attention to what
      Source       Views 966       Time 2019/12/12 05:27:37

    How to supply high-quality stone for construction projects?, can start from the following six aspects, from the beginning of the selection of materials to the final packaging disposal, are not negligence.

    One, material selection

    Before sealing the stone samples, communicate with the designer according to the requirements of the stone consumption of the project and the action diagram, and deliver the samples corresponding to the requirements.After sealing the sample, according to the end of the customer needs to choose the requirements of the mine to choose the same hole to choose the raw materials, in order to produce.All wastes are numbered in the mine and put into storage.

    Two, raw material cut

    After the waste is expected to plant, there will be waste material inspector to participate in the waste material to make the beginning of the evaluation, according to the pattern, stone classification number storage, and according to the waste material standards to give the cut proposal, as far as possible to improve the utilization rate.

    The sand saw and disk saw workshop will select the appropriate material number of the detailed items according to the opening statement of the material class, and then collect the material according to the number, and then organize the cutting of the material.After cutting the same raw material according to the "raw material number + plate number" pattern to each plate number.After the second inspection by the inspector, make the big board storage list.Such a number check method, can ensure that the stone in the same area to choose the same area and even the same waste material, in the future the same project demand to make up the supply of time can also be based on the large plate number to find color stone near the large plate;

    Three, plate cut

    The control of color and quality in the bridge cutting workshop is primarily reflected in the process of processing, before doing the standard cutting processing, will do a full inspection of the stone to be cut, about the crack line, stone gallbladder some reasonable escape, as far as possible progress rate of finished products;

    4. Protection and disposal

    Imported sikang protective agent is selected for protective treatment, which can be divided into oil and water.Usually for 6 sides 3-5 times more than repeated brushing method.

    Five, typesetting inspection

    All the data board equipment before, will be in the factory "rehearsal".In the natural light, ensure the color uniformity natural;

    Vi. Numbered package

    According to the layout function, the packers will number the qualified products according to the direction of the device through protective disposal and plate inspection, and attach two or more plate diagrams to the outer packing boxes.

    伊苏11| 亚运蠹场 情韵悠长| b站网名| 班徽设计一键生成| 地屐垲汥和谁合作过| 发朋友圈| 花同提壶方大厨第一季免费观看 | 广东人试考试网 -官网| 乔纳坦·克里斯蒂| 周杰伦金曲奖| 世界斯诺克锦标赛| 植物大战恒尸杂交版通关| 电视剧天庭良知| 小俊在雪姨身上耕耘小说免费阅读| xmnind思雄导图鼓解质| 千千阙歇 伴妻| HTTPS://9.1.CRM...| 开机小键盘默认开启怎么设置| 邢个女随对投说| 刘罗锅| 思想道德与法治2023版电子课本 | 羞羞成人网| 汽车吧| 诺克萨斯竟技场棋盘特效| 欧关少妇视频| 韩剧《我的瑜伽教练》| 厨具展会2024年时问表| 中国人手语操| 丫头把腿开大让我添添| 别逼我结婚电视剧35集免营观看全集| 种子链接下载神器| 宝可梦Xy| 生日贺卡祝福| 戏说乾隆42集免费观看| 七年级下原历史| 水川枫| intel high definition dsp